Kontum Sugar JSC

Items performed at Kon Tum Sugar Joint Stock Company

1/ Replaced 02 new exhaust fans to reach a capacity of 60T/h (including construction + electricity) calculated for each furnace's capacity to be 30T/h.


Dismantled the old Exhaust Fan

Installed a new Exhaust Fan

2/ Replaced the 02 furnaces' economizers: Dismantled the old heater and supplied and installed a new one.

Dismantled the old economizer

Installed new economizer

3/ Handled defects of convection tubes

4/ Replaced the main steam pipe from 02 furnaces to the manifold (DN200 pipe + DN200 valve).

5/ Replaced the steam temperature regulator for 02 boilers.

6/ Insulated some gap positions.

7/ Supplied and installed new automatic boiler water supply valve (DN40/PN64: 02 pieces, electrically controlled, including electrical system).

Share